Metrobil Technology offers solutions suitable for the needs of LED display systems to institutions and brands by providing quality and cost-effective products with a technology-oriented approach.

LED products in our company's portfolio, with flawless design, high quality hardware and effective software solutions integration features are produced in accordance with international quality standards (German EMC, Euro EN 12966 and ISO 9001: 2000, CCCC, CE, FCC, CE ROHS certifications) and are used today in more than 100 countries worldwide.

While providing services with first class methods in the field of LED screen display systems, we have the belief of "Quality and Honesty" and the goal of being the best global supplier of LED Display solutions, knowing the power of teamwork.

LED Production Infrastructure

Our LED products are manufactured on fully automatic lines equipped with advanced technology and high precision testing tools.
As a result of our understanding of zero-defect policy, our products also undergo a series of quality control tests after production.
Comprehensive reliability tests are implemented to eliminate potential defects in the design and manufacturing processes of our LED products.
Flawless quality control mechanisms are in place to guarantee product quality in all manufacturing processes.
Excellent quality with engineering and management standards such as IQC, IPQC, LQC, OQC, QE ...

Product Groups

Indoor and Outdoor
Transparent Screen

Interior
LED Screens


Outdoor
LED Screens


Mobile
LED Screens


Signage
LED Screens


Racket
LED Screens

Oval
LED Screens

Hanging Stage
LED Screens

Totem
LED Screens

LED
Lighting

References About LED Display Solutions

Gaziosmanpasa Municipality

18 pieces of Electronic LED Screens and a live broadcast connection device from 3G network were installed in various places in Gaziosmanpaşa district.


Ümraniye Municipality

1 Indoor and 5 Outdoor digital data boards were installed.


Bağcılar Municipality

3 Totems, 6 LED Screens and 2 Double-Sided LED Screens were installed and 1-year maintenance operation work was completed successfully.